Designed and Maintained by
Local Computer Service
www.localcs.com

Central Control Unit Test & Assembly Line

 

Test and production line to assemble ‘Central Control Units’ used in automobiles. The first part of the line is a test line for ICT, functional test and programming of multiple PCB-panels. After the test the good boards are depaneled into 6 individual PCB’s and transported into the assembly line. In the assembly line the PCB’s are placed and fixed in the bottom part of the unit. The next process places the top cover of the unit followed by a measurement of the exact height of the closed unit. After the assembled units have been tested, they are labeled and packed in magazines.

  • Loading & Unloading, Handling

  • Programming & Testing

  • Depaneling

  • Feeding

  • Assembly

  • Final Testing

  • Labeling

  • Packing

Specifications

CentralControlUnit.pdf